- How do I get digital solar?
- Can I make reservations in batches?
- What does full-term savings mean?
- Can I exit my reservation before the term period?
- Do I need to be in the same location as the project to reserve from it?
- What is the minimum capacity I can reserve?
- What does XIRR mean here?
- What are the cost incurred to users for reservation?
- How do we decide the system capacity?
- How do we ensure the build quality of the components?
- Would my credit amount fluctuate?
- How do we resolve system issues?
- Is the system connected to the grid?
- Who owns this project? What happens when I reserve from a project?
- What is a Host Agreement?
- What happens if the host defaults payments?